FM 97.5   FM 98.3   FM 100.1   FM 100.5   FM 100.7   FM 103.5

Published: February 8, 2019


WILSON DAM ROAD AND BRIDGE WILL BE CLOSED UNTIL EARLY NEXT WEEK.  THE TIMES DAILY REPORTS THE CLOSURE IS DUE THE DAM SPILLING WATER AND THE ASSOCIATED MIST, COMBINED WITH THE FREEZING TEMPERATURES CLOUD CAUSE AN ICING HAZARD ON THE CONCRETE SURFACE.  THE TVA WILL OPEN THE ROUTE MONDAY.